UK SRSThe UK Sustainability Reporting Standards, ESOS, SECR and TCFD, read against the published text.HUBYOU ARE HEREUK SRS GuideAn independent reference guide to UK SRS, ESG, TCFD, SECR, ESOS and the global standards.Global Reporting StandardsSustainability reporting standards worldwide: ISSB, the EU CSRD after Omnibus I, California SB 253 and SB 261, and UK SRS.UK SRS StandardsUK SRS S1 and S2 at the provision: reliefs, comply or explain, and the FCA statements.ESOS QuestESOS Phase 4 in depth: qualification, the audit, sign-off, action plans and penalties, read against the Regulations.SRS EngineeringThe data build behind a UK SRS report: metrics, owners, controls and timing.SRS ReportWhat a UK SRS report contains, how it is assembled, and how to read one.UK SRS ReportAnalysis and commentary: CDP, the DESNZ emission factors, SECR and ESOS, with every figure cited.UK SRS NewsThe cluster's news publication, and what a UK SRS report contains.UK SRS DeliveryTemplates, costs, ESOS delivery guides and readiness assessment.UK SRS FinanceFinanced emissions, PCAF and IFRS S1/S2 for banks, insurers and asset managers.SECRStreamlined Energy and Carbon Reporting: deadlines, thresholds, eligibility and guidance.Carbon CreditsCarbon credit ratings, risk analysis, valuation and market structure.Environmental RegimesThe eight UK environmental reporting regimes, their thresholds, deadlines and regulators.UK SRS ServicesThe services arm: ESOS, SECR, net zero and sustainability consultancy.

PPN 006 · tenders · net zero commitment

Carbon reduction plan software: built for the tender, not the brochure

Carbon reduction plan software builds the Carbon Reduction Plan a supplier needs for major UK government contracts under PPN 006.

The format is fixed, the emissions scope is narrower than people think, and the plan has to be signed off by the company.

The rules are on the PPN 006 guide and the carbon reduction plan requirements.

When you need one

When does a supplier need a carbon reduction plan?

PPN 006 applies to procurements commenced on or after 24 February 2025 with an estimated contract value above £5 million a year, including VAT (Cabinet Office).

It is procurement policy that binds in-scope contracting authorities, not a legal duty on companies.

NHS England accepts a plan built to PPN 006 and asks for a lighter Net Zero Commitment below the same threshold (NHS England).

What it covers

Which emissions should carbon reduction plan software calculate?

The Technical Standard asks for Scope 1 and 2 in full and only five Scope 3 categories (Technical Standard).

Included Scope 3 categoryTypical data
Upstream transportation and distributionFreight invoices, distances, weights
Waste generated in operationsWaste transfer notes, tonnages
Business travelExpense and travel booking records
Employee commutingStaff survey or estimates
Downstream transportation and distributionDelivery records
A CRP is not "full Scope 3"

Purchased goods and services, capital goods and the other categories are excluded, so a tool that reports the plan as covering Scope 3 overstates it.

The commitment

What must the plan commit to?

The plan must confirm a commitment to net zero by 2050 in the UK, and set out the measures the company will take.

Software can model those measures, for example with a marginal abatement cost curve, but PPN 006 does not require one (Forest Research).

The plan is signed off by the company; no software, consultant or verifier can sign it for you.

Verification

Does carbon reduction planning software need verified figures?

No: the Technical Standard says there is no requirement to have the footprint audited, though it names ISO 14064-3 as widely used (Technical Standard).

For the calculation layer see carbon accounting software and decarbonisation software.

The demonstration

What should you test before buying?

Ask the vendor to produce a draft plan from one year of your data.

Software demo · evidence check

Carbon reduction plan demo coverage

Tick a test only when the vendor has demonstrated it with a representative record and shown the evidence or export.

Which outputs did the demonstration prove?

0 of 5 tests demonstrated (0%). This is a checklist result, not a score for the vendor.

Still to test: Produce Scope 1, 2 and exactly the five PPN 006 Scope 3 categories; Show the baseline year and the current reporting year side by side; State the net zero by 2050 commitment in the PPN 006 wording; List reduction measures with their expected effect; Export the plan in the format the Technical Standard asks for.

Frequently asked

Carbon reduction plan software, answered

What is carbon reduction plan software?

Software that builds a Carbon Reduction Plan in the format PPN 006 asks for: a baseline and current footprint, the reduction measures, and the commitment to net zero by 2050, ready for a tender.

Is a carbon reduction plan a legal requirement?

No. PPN 006 is procurement policy that binds in-scope contracting authorities; it is not a legal duty on companies.

A supplier needs a plan to bid for in-scope contracts.

Which emissions does a PPN 006 carbon reduction plan cover?

Scope 1 and 2 in full, plus five Scope 3 categories: upstream transport and distribution, waste generated in operations, business travel, employee commuting and downstream transport and distribution.

Does a carbon reduction plan need to be verified?

No. The Technical Standard says there is no requirement to have the footprint audited, while naming ISO 14064-3 as a widely used verification standard.

Sources

Primary sources

Every figure, date and status on this page traces to the instrument’s owner.

Secondary commentary is never the source for a number.

Book a free consultation