UK SRSThe UK Sustainability Reporting Standards, ESOS, SECR and TCFD, read against the published text.HUBYOU ARE HEREUK SRS GuideAn independent reference guide to UK SRS, ESG, TCFD, SECR, ESOS and the global standards.Global Reporting StandardsSustainability reporting standards worldwide: ISSB, the EU CSRD after Omnibus I, California SB 253 and SB 261, and UK SRS.UK SRS StandardsUK SRS S1 and S2 at the provision: reliefs, comply or explain, and the FCA statements.ESOS QuestESOS Phase 4 in depth: qualification, the audit, sign-off, action plans and penalties, read against the Regulations.SRS EngineeringThe data build behind a UK SRS report: metrics, owners, controls and timing.SRS ReportWhat a UK SRS report contains, how it is assembled, and how to read one.UK SRS ReportAnalysis and commentary: CDP, the DESNZ emission factors, SECR and ESOS, with every figure cited.UK SRS NewsThe cluster's news publication, and what a UK SRS report contains.UK SRS DeliveryTemplates, costs, ESOS delivery guides and readiness assessment.UK SRS FinanceFinanced emissions, PCAF and IFRS S1/S2 for banks, insurers and asset managers.SECRStreamlined Energy and Carbon Reporting: deadlines, thresholds, eligibility and guidance.Carbon CreditsCarbon credit ratings, risk analysis, valuation and market structure.Environmental RegimesThe eight UK environmental reporting regimes, their thresholds, deadlines and regulators.UK SRS ServicesThe services arm: ESOS, SECR, net zero and sustainability consultancy.

Packaging · four nations

Deposit return scheme: 20p on a can from October 2027

The UK’s deposit return scheme starts on 1 October 2027 in all four nations.

Shoppers pay a deposit on drinks in plastic bottles and cans and get it back when they return the empty container.

Glass is out everywhere except Wales.

By nation

One date, three rules on glass

Scotland’s 2025 amendment also raised its minimum container size from 50 ml to 150 ml.
NationLawLaunchGlass
England and Northern IrelandSI 2025/671 October 2027Out
ScotlandSSI 2020/154, as amended by SSI 2025/1881 October 2027Out since 20 June 2025
WalesWSI 2026/1031 October 2027In, at 0p until 1 October 2031

Defra says it is “firmly committed” to launching in October 2027.

UK Deposit Management Organisation Ltd, trading as Exchange for Change, runs the scheme: approved for England and Northern Ireland on 6 May 2025, designated in Scotland in June 2025 and appointed in Wales on 20 August 2026.

What is in

Which containers carry a deposit

In England and Northern Ireland, an in-scope container is made wholly or mainly from aluminium or steel, or PET plastic, with a capacity between 150 millilitres and 3 litres.

HDPE containers such as milk bottles are out, as are liquid medicines and flavour enhancers such as syrups and hot sauces.

The deposit is a flat 20p, which Exchange for Change announced in April 2026.

That figure is the administrator’s, not a statutory one, so it can move without new legislation.

Packaging EPR

Where DRS meets packaging EPR

Producers already pay no EPR disposal fees on PET, aluminium and steel drink containers of 150 ml to 3 litres: regulation 57(3) of SI 2024/1332 leaves them out of the fee calculation.

Glass drink containers stay inside packaging EPR.

If no UK deposit scheme is running on 1 January 2028, regulation 136 reads those carve-outs as omitted, and fees apply from the 2028/29 assessment year.

What to plan for

The administrator, registration and appeals provisions of SI 2025/67 came into force the day after it was made, well ahead of the 1 October 2027 launch.

The reporting side of packaging is on packaging EPR reporting requirements; the separate tax on plastic packaging is on plastic packaging tax.

Frequently asked

The deposit return scheme, answered

When does the UK deposit return scheme start?

On 1 October 2027 in England, Northern Ireland, Scotland and Wales.

For England and Northern Ireland the date is fixed by regulation 1(2) of SI 2025/67, and the government says it is firmly committed to launching in October 2027.

How much is the deposit?

A flat 20p per container, according to Exchange for Change, the deposit management organisation, in April 2026.

The figure is the administrator’s, not a statutory one, so it can change without new legislation.

In Wales, glass carries a 0p deposit until 1 October 2031.

Which drinks containers are in the scheme?

In England and Northern Ireland, containers made wholly or mainly from PET plastic, aluminium or steel, with a capacity between 150 millilitres and 3 litres.

HDPE containers such as milk bottles, liquid medicines and flavour enhancers such as syrups are out.

Is glass in the deposit return scheme?

Not in England, Northern Ireland or Scotland: Scotland removed glass from its scheme on 20 June 2025.

Wales includes glass from launch, with a four-year transitional period to 30 September 2031 during which glass carries a 0p deposit.

Who runs the deposit return scheme?

UK Deposit Management Organisation Ltd, trading as Exchange for Change, approved for England and Northern Ireland on 6 May 2025, designated in Scotland in June 2025 and appointed in Wales on 20 August 2026.

How does DRS affect packaging EPR?

PET, aluminium and steel drink containers of 150 millilitres to 3 litres are already outside packaging EPR disposal fees under regulation 57(3) of SI 2024/1332; glass ones are not.

If no UK deposit scheme is running on 1 January 2028, regulation 136 brings those containers back into EPR, with fees from the 2028/29 assessment year.

Has the deposit return scheme been delayed again?

No delay has been announced.

Every nation’s scheme is legislated for 1 October 2027, and Defra’s update page, last updated in August 2026, repeats the October 2027 commitment.

Sources

Primary sources

Dates and scope are from the instruments; the deposit is the administrator’s own published figure.

Checked against 7 sources fromlegislation.gov.ukDefraExchange for Change (the UK deposit management organisation)
  1. legislation.gov.uk
    SI 2025/67, regulation 1 (England and Northern Ireland)

    The scheme in force on 1 October 2027; the administrator’s machinery the day after making.

  2. legislation.gov.uk
    SSI 2025/188 (Scotland)

    Scotland’s launch moved to 1 October 2027 and glass removed from 20 June 2025.

  3. legislation.gov.uk
    WSI 2026/103 (Wales)

    Wales launches 1 October 2027 with glass in scope.

  4. Defra
    UK government update: Deposit Return Scheme for drinks containers

    “We are firmly committed to our timeframe of launching a Deposit Return Scheme in October 2027.”

  5. Exchange for Change (the UK deposit management organisation)
    Exchange for Change confirms flat 20p deposit value for DRS

    The administrator’s own statement of the deposit; not set by any statutory instrument.

  6. legislation.gov.uk
    SI 2024/1332 (packaging EPR), regulation 57

    Non-glass drink containers already outside EPR disposal fees.

  7. legislation.gov.uk
    SI 2024/1332 (packaging EPR), regulation 136

    The fallback if no UK deposit scheme is running on 1 January 2028.

Book a free consultation