UK SRSThe UK Sustainability Reporting Standards, ESOS, SECR and TCFD, read against the published text.HUBYOU ARE HEREUK SRS GuideAn independent reference guide to UK SRS, ESG, TCFD, SECR, ESOS and the global standards.Global Reporting StandardsSustainability reporting standards worldwide: ISSB, the EU CSRD after Omnibus I, California SB 253 and SB 261, and UK SRS.UK SRS StandardsUK SRS S1 and S2 at the provision: reliefs, comply or explain, and the FCA statements.ESOS QuestESOS Phase 4 in depth: qualification, the audit, sign-off, action plans and penalties, read against the Regulations.SRS EngineeringThe data build behind a UK SRS report: metrics, owners, controls and timing.SRS ReportWhat a UK SRS report contains, how it is assembled, and how to read one.UK SRS ReportAnalysis and commentary: CDP, the DESNZ emission factors, SECR and ESOS, with every figure cited.UK SRS NewsThe cluster's news publication, and what a UK SRS report contains.UK SRS DeliveryTemplates, costs, ESOS delivery guides and readiness assessment.UK SRS FinanceFinanced emissions, PCAF and IFRS S1/S2 for banks, insurers and asset managers.SECRStreamlined Energy and Carbon Reporting: deadlines, thresholds, eligibility and guidance.Carbon CreditsCarbon credit ratings, risk analysis, valuation and market structure.Environmental RegimesThe eight UK environmental reporting regimes, their thresholds, deadlines and regulators.UK SRS ServicesThe services arm: ESOS, SECR, net zero and sustainability consultancy.

Trustees · metrics · fund manager data

Pension scheme climate reporting software: most of the data is someone else’s

Pension scheme climate reporting software helps trustees meet the TCFD-aligned governance and reporting duty in SI 2021/839.

Almost all the data comes from fund managers, so the software is judged on how it collects, checks and dates third-party data.

The duty is explained on the pension scheme climate reporting guide.

Who reports

Which trustees need climate reporting software?

The duty phased in by size: schemes with £5 billion or more in relevant assets from 1 October 2021, £1 billion or more from 1 October 2022, plus all authorised master trusts and authorised CDC schemes (SI 2021/839).

Trustees must publish the report within seven months of each scheme year-end.

Company climate disclosures under the Companies Act or UK SRS are separate duties for the sponsoring employer.

Metrics

What must the software calculate?

DWP’s statutory guidance asks for at least four metrics, and for scenario analysis in the first scheme year and at least every three scheme years after that (DWP).

Metric typeExample
Absolute emissionsTotal financed emissions of the portfolio
Emissions intensityEmissions per £ million invested
Portfolio alignmentShare of the portfolio with a science-based target
Additional climate metricA metric chosen by the trustees

Enforcement

What is the risk of a missed report?

The penalty for failing to publish the report on a publicly available website is mandatory, with a floor of £2,500.

The trigger is publication, not report quality, so the software should track the publication deadline as closely as the content.

For the calculation method see financed emissions software; for corporate climate rules see climate disclosure software.

The demonstration

What should you test before buying?

Load holdings and manager data for two of your funds.

Software demo · evidence check

Trustee climate reporting demo coverage

Tick a test only when the vendor has demonstrated it with a representative record and shown the evidence or export.

Which outputs did the demonstration prove?

0 of 5 tests demonstrated (0%). This is a checklist result, not a score for the vendor.

Still to test: Show each manager’s data, its date and how much is estimated; Calculate the four required metrics; Record scenario analysis and the year it is next due; Track the seven-month publication deadline; Export a draft report for the trustees.

Frequently asked

Pension scheme climate reporting software, answered

What is pension scheme climate reporting software?

Software that collects climate data from fund managers, calculates the scheme’s climate metrics and scenario analysis, and helps trustees publish the report SI 2021/839 requires.

Which pension schemes must publish a climate report?

Schemes with £1 billion or more in relevant assets, and all authorised master trusts and authorised collective defined contribution schemes.

Which metrics do trustees have to report?

At least four: an absolute emissions metric, an emissions intensity metric, a portfolio alignment metric and one additional climate metric.

What happens if trustees do not publish?

The penalty for failing to publish the report on a publicly available website is mandatory, with a floor of £2,500.

Sources

Primary sources

Every figure, date and status on this page traces to the instrument’s owner.

Secondary commentary is never the source for a number.

Book a free consultation