Service outage
Make a written record within the normal deadline; enter it within 7 days of the outage ending.
SI 2026/729 reg 6The standards
Does it apply to you
Reporting under it
Start here
Dates and penalties
Doing it
What you must file
Doing it
Start here
Setting targets
Who and where
The UK duty
Doing it
The baseline
Europe
Reporting more widely
Carbon markets and trade
Packaging and net zero
Carbon accounting
Choosing
Carbon
Compliance and offsets
Software
Templates
Careers
Software · digital waste tracking, cited
Waste tracking software records each movement of waste and, for a permitted site receiving waste in England, sends every load to the government’s digital waste tracking service by the end of the second working day.
This page sets out how software connects to that service, what it must do for each load, and the questions to put to a vendor; it names and ranks no product.
What the software does
Waste tracking software follows waste movement by movement, and for a permitted receiving site in England it now has a legal job: getting every load into the government’s system on time.
The operator must record the specified information for each load and check it has entered the system by the end of the second working day after receipt, under regulation 4 of SI 2026/729.
The whole waste record — duty of care, separation, packaging and reporting — is covered on waste management software.
This page is the connection itself: the API, the onboarding and the proof.
The load arrives at the permitted site.
The specified information captured in a digital waste record.
Sent to the service by API, with the site’s API Code.
The digital waste record number returned and stored.
Errors fixed within a month; outages caught up within 7 days.
Who and when
The duty falls on the operator of a permitted facility receiving controlled waste, and applies in England from 1 October 2026 under SI 2026/729.
Defra’s developer guide gives permitted or licensed sites in England and Wales from 1 October 2026, and Scotland and Northern Ireland from 1 January 2027; this page has read only the England instrument.
Defra’s policy paper plans the duty for waste collectors from October 2027.
Household waste deposited by residents at a council’s own site is outside regulation 4, under regulation 4(2).
Digital waste tracking
Connecting software
Defra’s developer guide sets out the route: register, receive test credentials, build against the Receipt of Waste API, run the Production Approval Test scenarios, self-certify, and receive production credentials.
The test scenarios run from a single-item receipt to complex mixtures of hazardous waste and persistent organic pollutants.
Access uses OAuth client credentials and a bearer token, according to the authentication guide, and each receiving site gets its own API Code to pass to its software provider.
The API specification is marked public beta and may change, so a vendor should be able to say how quickly it follows each change.
Sign up as a software provider and accept the API terms.
A client ID and secret for the test environment.
Integrate with the Receipt of Waste API and its reference data.
Run the Production Approval Test scenarios.
Confirm by email that the software meets the requirements.
Production credentials; each receiver gets its own API Code.
Your deadline
The tool beside this sorts the waste duties by role and nation, and for a receiving site in England works out the deadline for one load from the day it arrived.
The deadline is the end of the second working day after the day the load is received, under regulation 4(8).
The fee is £26 a year under regulation 5, separate from any software cost.
A product should show the deadline on every load and warn before it passes, not report the miss afterwards.
Your waste-record duties
Duty of care on every transfer
Pass the waste only to an authorised person, with written information carrying the List of Wastes code, quantity and SIC code. Both sides keep it for at least two years; it may be electronic.
Digital waste tracking: in force
Record every load received and check it has entered the government system by the end of the second working day; £26 a year per operator.
A load received on Friday, 6 November 2026 must be in the system by the end of Tuesday, 10 November 2026.
Weekends are skipped; bank holidays are not, so a deadline across one falls a day later than shown.
Nothing is stored or sent.
Approval
The regulations give the person running the system functions that include “the approval of software”, under regulation 3(3) of SI 2026/729.
Defra’s developer guide, updated 14 October 2026, describes software providers self-certifying after the Production Approval Tests, and says Defra does not review, mark or approve those results at that stage.
Both are true as written, so the safe question to a vendor is how and when it completed onboarding and received production credentials, not whether it is “approved”.
Defra’s developer pages read for this page do not publish a list of connected products.
Software approval
Software approval
Software approval
Software approval
When things go wrong
If the service is down, the operator makes a written record within the normal deadline and enters it within 7 days beginning with the day after the outage is resolved, under regulation 6.
An error must be corrected within one month of the operator becoming aware of it, under regulation 7(2).
A product should queue records through an outage and keep both the original and the correction, each dated, rather than overwrite.
Make a written record within the normal deadline; enter it within 7 days of the outage ending.
SI 2026/729 reg 6Correct it within one month of becoming aware of it.
SI 2026/729 reg 7(2)Producers and carriers
Receiving sites
Digital trackingEngland from 1 October 2026Collectors
October 2027Planned, per DefraProducers
Duty of careRecords kept two yearsFee
£26 a yearReceiving sites — reg 5Every business that produces, carries or keeps controlled waste is under the duty of care in section 34 of the Environmental Protection Act 1990, and nothing in SI 2026/729 revokes it.
The written information on each transfer, set out in regulation 35, may be electronic and must be kept for at least two years by both sides.
A producer’s tonnages also feed packaging EPR under SI 2024/1332, ESRS E5 for EU reporters under the revised ESRS, and the waste category of a PPN 006 Carbon Reduction Plan.
Hazardous waste moves under a consignment note, and the digital record for a hazardous load carries the consignment note code, under Part 2 of Schedule 1 to SI 2026/729.
The tests before you sign
Each question beside this names the regulation or Defra page it comes from and what a passing answer looks like.
Run them on your own loads, because a demonstration never has a Friday delivery, a hazardous mixture or an outage.
Nothing on this page is a rating, ranking or recommendation of any product.
Waste tracking demo questions · tick the ones you need
The pass tests are our reading of the cited provisions.
Nothing you tick is stored or sent.
Every load a permitted English site receives must reach the government’s system within two working days, and the record number is the proof.
Takeaways
| The fact | What to do |
|---|---|
| Digital waste tracking is law for English receiving sites from 1 October 2026 | Confirm your software submits by API with your site’s API Code |
| Each load has a two-working-day deadline | Show the deadline on every load and warn before it passes |
| Providers self-certify under Defra’s current guide | Ask how and when a vendor completed onboarding |
| Producers stay on the duty of care | Keep transfer information for at least two years |
Start with the deadline tool, then take the demo questions to vendors.
Frequently asked
Software that records each movement of waste — what it is, how much, who carried it and where it went — and, for a permitted site receiving waste in England, sends each load to the government’s digital waste tracking service.
Defra built the service to take data from waste businesses’ existing software through an API.
For operators of permitted facilities receiving waste in England, yes, from 1 October 2026 under the Digital Waste Tracking (England) Regulations 2026.
Each load must be recorded and checked into the system by the end of the second working day after receipt.
Defra’s developer guide gives England and Wales from 1 October 2026 and Scotland and Northern Ireland from 1 January 2027.
In the first phase, the operators of permitted or licensed facilities that receive waste.
Defra’s policy paper plans the duty for waste collectors from October 2027.
Businesses that only produce waste remain under the duty of care, keeping written transfer information for at least two years.
Through the Receipt of Waste API.
A software provider registers with Defra, builds against a test environment using OAuth client credentials, runs Defra’s Production Approval Test scenarios, self-certifies, and receives production credentials.
Each receiving site then gets its own API Code to give to its software provider.
The regulations give the person running the system functions that include “the approval of software”.
Defra’s developer guide, updated 14 October 2026, describes software providers self-certifying after the Production Approval Tests and says Defra does not review, mark or approve those results at that stage.
Ask any vendor how it completed onboarding and when.
The operator makes a written record within the same deadline and enters it into the system within 7 days beginning with the day after the outage is resolved, under regulation 6 of SI 2026/729.
Within one month of the operator becoming aware of the error, under regulation 7(2).
A product should keep the original and the correction, each dated.
The government fee is £26, payable when the duty first arises and on each anniversary.
Software to connect to the service is a separate, commercial cost.
Defra offers a spreadsheet route as a temporary solution, expected to remain until at least October 2027.
The service is designed around API submission from existing software.
It is one part of it.
Waste management software keeps the whole waste record — duty of care, separation, packaging and reporting tonnages; waste tracking software is the movement-by-movement part, and for receiving sites the connection to the digital service.
No. The page is built from the regulations, Defra’s policy paper and its developer guide, and it names no product.
Sources
Every duty and date on this page traces to the instrument, policy paper or developer guide listed here.
In force 1 October 2026; the system’s functions include “the approval of software”.
Record each load and check it is in the system by the end of the second working day.
The £26 fee, then on each anniversary.
API-first; spreadsheet as a temporary route; collectors from October 2027.
Test credentials, Production Approval Tests, self-certification, production credentials.
Receivers and developers; test and production environments; API codes.
Public beta; may change with policy, legislation and feedback.
OAuth client credentials and a bearer token.
The duty of care on everyone who handles controlled waste.
Written information on each transfer, kept for at least two years.
Packaging tonnage data owed by producers.
ESRS E5: resource outflows related to waste.
Waste generated in operations, a Scope 3 category in a Carbon Reduction Plan.
Waste emissions as a value-chain category.
All sustainability-related risks and opportunities, where material.
Comply or explain for periods beginning on or after 1 January 2027.