UK SRSThe UK Sustainability Reporting Standards, ESOS, SECR and TCFD, read against the published text.HUBYOU ARE HEREUK SRS GuideAn independent reference guide to UK SRS, ESG, TCFD, SECR, ESOS and the global standards.Global Reporting StandardsSustainability reporting standards worldwide: ISSB, the EU CSRD after Omnibus I, California SB 253 and SB 261, and UK SRS.UK SRS StandardsUK SRS S1 and S2 at the provision: reliefs, comply or explain, and the FCA statements.ESOS QuestESOS Phase 4 in depth: qualification, the audit, sign-off, action plans and penalties, read against the Regulations.SRS EngineeringThe data build behind a UK SRS report: metrics, owners, controls and timing.SRS ReportWhat a UK SRS report contains, how it is assembled, and how to read one.UK SRS ReportAnalysis and commentary: CDP, the DESNZ emission factors, SECR and ESOS, with every figure cited.UK SRS NewsThe cluster's news publication, and what a UK SRS report contains.UK SRS DeliveryTemplates, costs, ESOS delivery guides and readiness assessment.UK SRS FinanceFinanced emissions, PCAF and IFRS S1/S2 for banks, insurers and asset managers.SECRStreamlined Energy and Carbon Reporting: deadlines, thresholds, eligibility and guidance.Carbon CreditsCarbon credit ratings, risk analysis, valuation and market structure.Environmental RegimesThe eight UK environmental reporting regimes, their thresholds, deadlines and regulators.UK SRS ServicesThe services arm: ESOS, SECR, net zero and sustainability consultancy.

LEED Online · Arc · credits

LEED software: USGBC’s platforms first

LEED software starts with USGBC’s own platforms, LEED Online and Arc, where projects are documented and reviewed.

Other tools add energy modelling, evidence gathering and credit tracking around them.

The scheme is explained on the LEED certification UK guide.

Official tools

What are LEED Online and Arc?

USGBC describes LEED Online and Arc as its digital project-management and performance tools for LEED projects (USGBC).

Its support materials say LEED v5 registration, documentation and review are managed in Arc (USGBC).

Any third-party tool should therefore export cleanly into Arc rather than replace it.

Ratings

Which LEED levels should the software track?

Projects are reviewed by GBCI and certified at four levels (USGBC).

LevelPoints
Certified40–49
Silver50–59
Gold60–79
Platinum80+

UK use

When do UK projects need LEED software?

LEED appears in UK legislation in one place found, a 2025 special development order for a Bedford resort (SI 2025/1322).

Most UK LEED projects are driven by an international owner or occupier policy, often alongside BREEAM.

For investor reporting, GRESB scores design and construction certifications on floor-area coverage; see GRESB software and BREEAM software.

The demonstration

What should you test before buying?

Ask the vendor to set up one project and show the hand-off to Arc.

Software demo · evidence check

LEED demo coverage

Tick a test only when the vendor has demonstrated it with a representative record and shown the evidence or export.

Which outputs did the demonstration prove?

0 of 5 tests demonstrated (0%). This is a checklist result, not a score for the vendor.

Still to test: Register the project against LEED v5 and the right rating system; Track predicted points against the target level; Attach evidence to a credit with its owner; Export documentation in a form that loads into Arc; Keep UK units and data sources visible.

Frequently asked

LEED software, answered

What is LEED software?

USGBC’s own tools, LEED Online and Arc, hold the documentation and review for a LEED project; third-party tools help gather evidence, model energy and track credits.

What are the LEED certification levels?

Certified (40–49 points), Silver (50–59), Gold (60–79) and Platinum (80 or more), reviewed by GBCI.

Which LEED version is current?

USGBC launched LEED v5 on 28 April 2025 for BD+C, ID+C and O+M, and says v5 project registration, documentation and review are managed in Arc.

Is LEED required in the UK?

Rarely.

It appears in UK legislation in one place found: the Bedford entertainment-resort Special Development Order 2025.

Sources

Primary sources

Every figure, date and status on this page traces to the instrument’s owner.

Secondary commentary is never the source for a number.

Book a free consultation